Nowa Sól • Zielona Góra • testing • acceptance • PV

Electrical testing and installation acceptance.

Acceptance and periodic tests, independent installation acceptance, photovoltaic PV systems, earthing and lightning protection.

4BIT performs measurements and technical assessments of installations in houses, flats, commercial premises, industrial facilities and public buildings.

Service scope

From visual inspection and testing to a report and technical assessment.

01

Protective testing

Fault-loop impedance, insulation resistance, RCD operation and continuity of protective conductors.

02

Earthing and LPS

Earth resistance, equipotential bonding and testing of lightning protection systems.

03

Photovoltaic PV

Visual inspection, AC and DC tests, and assessment of PV protection and switchgear.

04

Installation acceptance

Independent verification before taking over an installation or settling the contractor's work.

05

Periodic inspections

Houses, premises, property managers, commercial, industrial and public facilities.

06

Documentation

Clear test reports, result schedules, descriptions of defects and recommendations.

Electrical installation testing

Acceptance and periodic tests matched to the facility.

We test electrical installations according to the type of facility, supply arrangement, protective measures and the purpose of the inspection.

  • fault-loop impedance measurements
  • insulation resistance measurements
  • continuity of protective conductors and equipotential bonding
  • testing of RCD residual-current devices
  • earth resistance measurements
  • testing of lightning protection systems
  • verification of electric-shock protective measures
  • visual inspection of switchboards and installations
  • preparation of measurement documentation and reports

The test scope is selected for the installation, facility and purpose of the inspection.

Photovoltaic PV

PV system testing together with the building's electrical installation.

A photovoltaic system is part of the building's electrical installation and requires proper verification of its technical condition and protective measures.

  • visual inspection of the PV installation and cable routing
  • verification of protective bonding and earthing
  • assessment of installed protective devices
  • AC-side testing
  • DC circuit testing within the scope permitted by the system and the measuring method
  • assessment of AC/DC switchgear
  • preparation of a test report
Basic PV system testfrom PLN 600
PV + AC + earthing + protectionfrom PLN 900
House testing + PV systemfrom PLN 1,200
Large PV system / business facilityindividual quotation

The DC-side scope depends on the system design, accessible test points and functions of the instruments used.

Electrical installation acceptance

Independent technical assessment of houses and other facilities.

In addition to measurements, we can assess workmanship, protective devices, available documentation and compliance with the adopted technical solutions.

The acceptance scope may include

  • visual inspection of the installation and switchboards
  • verification of protection, RCDs and surge protection
  • assessment of protection against electric shock
  • verification of earthing and equipotential bonding
  • assessment of the lightning protection system, where present
  • required electrical tests
  • assessment against available documentation
  • identification of observed defects
  • preparation of acceptance documentation

Indicative price list

Installation acceptance

Flatfrom PLN 700
House up to 120 m²from PLN 1,100
House 120–200 m²from PLN 1,300
House 200–300 m²from PLN 1,600
House + PV systemfrom PLN 1,600
Commercial premisesfrom PLN 1,200
Workshopfrom PLN 1,500
Halls and industrial facilitiesindividual quotation

Contractor acceptance

Check the installation before final settlement of the works.

Acceptance need not be limited to checking whether sockets and lighting work. The installation can be technically verified, tested and documented before it is taken over from the contractor.

Independent acceptance of a detached housefrom PLN 1,500

Periodic inspections

Testing for owners, property managers and companies.

We carry out periodic checks of the technical condition of electrical installations. The scope is matched to the type of facility and installed systems.

houses and flatscommunities and property managersoffices and shopscommercial premisesworkshops and warehousesproduction hallsschools and public buildingsindustrial plants

Service process

Testing completed with clear documentation.

We first establish the actual condition and scope, then perform tests and formulate conclusions.

01

Scope

Confirmation of the facility, test purpose, documentation and access conditions.

02

Inspection

Assessment of the installation, switchboards, protection and visible defects.

03

Testing

Tests selected for the installation and the applied protective measures.

04

Report

Results, assessment, defect descriptions and recommended next steps.

Why 4BIT

Electrical testing combined with an engineering technical assessment.

The service is performed by an M.Sc. engineer holding Polish E and D electrical qualifications including testing, and unrestricted Polish building licences for design and management of electrical works.

E + DPolish electrical qualifications including inspection and measurement work.
UnrestrictedPolish building licences for electrical design and site management.
TestingProfessional measuring instruments and documented results.
Technical assessmentConclusions based on the installation, documentation and workmanship.

Service area

Nowa Sól, Zielona Góra and the Lubuskie region.

Testing and acceptance services are mainly provided in Nowa Sól, Zielona Góra, Otyń, Kożuchów, Siedlisko, Bytom Odrzański, Nowe Miasteczko, Sulechów, Żary, Żagań, Głogów and throughout the Lubuskie region. Larger assignments can also be carried out outside the region.

Quotation request

Briefly describe the assignment.

The button opens your e-mail application with a prepared message. The website does not send the form data to an external form provider.

Inquiry